
thyssenkrupp cooperates with Heidelberg Materials for the GeZero carbon capture project
Heidelberg Materials and thyssenkrupp Polysius have signed a front-end engineering design contract for the plant design of the clinker production line of the GeZero CCS project. The GeZero project in Geseke will be one of the first European cement plants capable of producing Net-Zero cement and clinker on a CCS (Carbon Capture and Storage) basis. The planning includes a potential capture capacity of around 2,000 tons per day, including the polysius® pure oxyfuel process.
Read the full article here!